1. Perform a detailed energy and exergy analysis of the combined cycle power plant in Figure 5.67; make reasonable assumptions.

2. Rework Example 5.12 for ∆z = 200 m and  = 12,000dm3 /s, with turbine efficiency of 80% and electromechanical losses of 4%.

Example 5.12

A typical hydropower setting is illustrated in Figure 5.69 and has a ∆z = 100 m level difference between the lake’s surface and downstream waters.

 